Link expressways and spurs
New roads planned to connect the Ganga Expressway (Meerut–Prayagraj, 594 km) to Noida International Airport, the Agra–Lucknow Expressway, Haridwar and Ballia. Land near an approved alignment can be frozen for sale or notified for acquisition, so check status before buying.
- Status
- Approved by UP Cabinet
- Length
- 74.467 km
- Cost
- ₹8,585.51 crore
Farrukhabad Link Expressway
Approved- Status
- Approved by UP Cabinet (September 2025); construction status not yet verified
- Length
- 91 km
- Cost
- ₹7,488.74 crore
- Status
- Approved by UP Cabinet (August 2026); DPR is the next step
- Length
- Data not yet verified
- Cost
- ₹10,761 crore
Prayagraj – Ballia Expressway (Spur-2)
Proposed- Status
- Pre-construction
- Length
- 314 km
- Cost
- Data not yet verified
Greater Noida – Hapur bypass road
Approved- Status
- Approved by GNIDA (May 2026)
- Length
- 37 km
- Cost
- Data not yet verified