Ganga Expressway: PROJECT ALIGNMENT DESCRIPTION

The proposed Ganga Expressway starts from km 16+000 of MeerutBulandshahar (NH-334) near village Bijoli (Dist. Meerut) (CH 7+900) & terminates at Prayagraj Bypass on NH-19 near village Judapur Dando (Dist. Prayagraj) (CH 601+847).

The length of the proposed expressway alignment is 593.947 km.

Aquisition, Bundelkhand Expressway, Ganga Expressway, Ganga Expressway Alignment, Ganga Expressway Map, Ganga Expressway Village List, Ganga Expressway Village Map, Meerut, Prayagraj, Uttar Pradesh, Yogi Adityanath

The proposed expressway has been divided into 12 packages. The chainage wise detail of the packages has been given below:

Package No.  Section DetailsChainage (km)  Length
FromTo
IFrom Village Bijoli (Dist. Meerut) to Village- Chandner (Dist. Hapur)7.90056.90049.000
IIFrom Village-Chandner (Dist. Hapur) to Village- Mirzapur Dugar (Dist. Amroha)56.90086.90030.000
IIIFrom Mirzapur Dugar (Dist. Amroha) to Village- Nagla Barah (Dist. Budaun)86.900137.60050.700
IVFrom Village-Nagla Barah (Dist. Budaun) to Village-Binawar (Dist. Budaun)137.600189.70052.100
VFrom Binawar (Dist.Budaun) to Girdharpur (Dist. Shahjahanpur)189.700236.40046.700
VIFrom Village- Girdharpur (Dist. Shahjahanpur) to Village-Ubariya Khurd (Dist. Hardoi)236.400289.30052.900
VIIFrom Village-Ubariya Khurd (Dist. Hardoi) to Village- Pandra Lakhanpur (Dist. Hardoi)289.300341.70052.400
VIIIFrom Village- Pandra Lakhanpur (Dist. Hardoi) to Village-Raiyamau(Dist. Unnao)341.700391.90050.200
IXFrom Village- Raiyamau (Dist. Unnao) to Village-Sarso (Dist. Unnao)391.900445.00053.100
XFrom Village- Sarso (Dist. Unnao) to Village- Terukha (Dist. Raebareli)445.000496.80051.800
XIFrom Village-Terukha (Dist. Raebareli) to Village-Arro (Dist. Pratapgarh)496.800548.80052.000
XIIFrom Village- Arro (Dist. Pratapgarh) to Village- Judapur Dando (Dist. Prayagraj)548.800601.84753.047
Total593.947

The Expressway is access controlled with only entry/exit at Nodes (intersecting points of National Highway or State Highways or Major District Roads – crossing with the proposed Expressway Alignment), details of which has been described below.

Alignment & Structures

The expressway alignment is having 6 Lanes with Paved Shoulders Configuration with Service Roads, which is further expandable up to 8 Lanes. The alignment has been designed with the design speed of 120 km/h.

Ganga Expressway: Node Development

The Expressway is access controlled with only entry/exit at Nodes (intersecting points of National Highway or State Highways or Major District Roads – crossing with the proposed Expressway Alignment).

Toll NodesChainageDetails of the Intersecting RoadsRoad No.Type of Interchange
A0+100Delhi – Meerut ExpresswayExpresswayDummy Node
B8+920Meerut – HapurNH-334Trumpet
C35+270Hapur – GarhmukteshwarNH-24Diamond
D54+640Bulandshahr – GarhmukteshwarSH-65Diamond
E74+181Hasanpur-AnupshaharMDR-162WDiamond
F102+427Anupshahr – MoradabadODRDiamond
G123+288Babrala – ChandausiNH-509Double Trumpet
H173+454Chandausi – BudaunSH-125Diamond
I189+394Budaun – BareillySH-33Double Trumpet
J255+167Farukkhabad – ShahjahanpurSH-29Double Trumpet
K282+845Farukkhabad – ShahbadSH-138Diamond
L329+945Kannauj– HardoiSH-21Double Trumpet
M378+136Agra – Lucknow ExpresswayAgra Lucknow ExpDouble Trumpet
N420+932Kanpur – LucknowNH-27Diamond
O487+285Lalganj – RaebareliNH-31Double Trumpet
P517+708Raebareli–UnchaharNH-30Double Trumpet
Toll NodesChainageDetails of the Intersecting RoadsRoad No.Type of Interchange
Q554+951Manikpur – Bela PratapgarhMDR-102EDiamond
R600+457Prayagraj BypassNH-19Trumpet

Node A is revised and treated as Dummy Node, as the Start Point of the Ganga Expressway has been changed from Node A to Node B due to Engineering Design Constraints, with prior approval of UPEIDA.

GANGA EXPRESSWAY: RIGHT OF WAY

ROW has been taken as total 120 m for the proposed expressway except at Interchange Locations, Toll Plaza locations and at locations for training on the course of nallah/drain, where the ROW varies.

ABUTTING LAND USE PATTERN

The land use pattern on the both sides of the expressway in maximum section is agricultural.

TERRAIN

The terrain of this stretch can be termed as plain and flat throughout.

FOREST

No forest land observed along the road. However, the alignment passes some stretches of Social Forestry.

ARCHEOLOGICAL/ANCIENT STRUCTURE

No such type of structure found along the project corridor.